HOTEL & HOSPITALITY

Hotel Furniture That Puts the Guest First

From the lobby to the suites, the restaurant and shared areas, we deliver durable contract furniture turnkey, from concept to production.

WHAT WE MAKE

One Concept from Lobby to Room

In a hotel every space must carry the same concept. We plan the lobby, rooms and food and beverage areas in one design language and one production schedule.

Hotel & Hospitality

Hotel and Hospitality Spaces

Durable contract solutions designed around the guest experience.

  • Lobby and reception design
  • Standard room and suite fit-out
  • Restaurant, cafe and bar furniture
  • Shared and social areas
38+Completed hotel projects
View our projects
Lyon Wood Design hotel furniture projectLyon Wood Design hotel furniture projectLyon Wood Design hotel furniture project

WHAT TO KNOW

About Hotel Furniture

How does the hotel furniture process work?

It starts with a site survey and needs analysis. We then present the concept, materials and 3D visuals for rooms and public areas. After approval, production runs in our own facility, our team completes installation and the project is handed over turnkey.

What matters most in hotel furniture?

Hotel furniture is used by a different guest every day, so durability, easy-to-clean surfaces, solid joinery and an exact fit to the room plan are decisive. The design must also carry the hotel's concept in one language from lobby to room.

Do you also make restaurant and cafe furniture?

Yes. We make the seating, tables, bars and service units for hotel restaurants, cafes and bars to measure, in the same design language as the hotel. We also quote for standalone restaurant and cafe projects.

Do you work on hotel projects abroad?

Yes, we export to 21 countries. On international projects we handle packaging, logistics and, where needed, coordination of on-site installation; the installation scope is confirmed in the quote.

Our other solutions

OUR PROCESS

Four Steps from Idea to Delivery

01 — Survey & Analysis

We survey your needs on site, measure the space and clarify your goals.

02 — Design & Presentation

We prepare the project for your approval with concepts, materials and 3D visuals.

03 — Manufacturing

We manufacture the approved design in our own facility, meticulously and on time.

04 — Installation & Delivery

Our professional team completes the installation and delivers the project turnkey.

Frequently Asked Questions

It depends on the number of rooms and the scope. Standard projects take 4-8 weeks on average from survey to handover; for large contract work the timeline is confirmed at the quotation stage.
Yes. With our own production facility we make bespoke pieces in project-specific dimensions, materials and designs.
Yes. Our own installation team sets everything up and we hand the project over turnkey. For projects abroad, the installation scope is stated in the quote.
All our products are covered by a materials and workmanship warranty. The period depends on the product group and is stated in the contract.

Let's Talk About Your Hotel Project

Contact us for a free survey and quote, and let us manage all production from lobby to room in one plan.

Last updated: